Hartsfield Jackson Atlanta Int. Airport

As a part of Delta’s commitment to enhance the customer experience, a significant upgrade to the Baggage Handling System is underway at HJAIA (Hartsfield-Jackson Atlanta International Airport). 
Vanderlande Industries will install over 22,000 linear feet of baggage handling conveyor, by expanding the outbound baggage handling system into Concourse B, and completely replacing the baggage claim units in the south arrivals lobby. 
The arrivals claim unit replacement was completed in May 2008. Travelers will notice a more sleek, fresh look at the arrivals claim units, making use of Vanderlande TRIPLANAR units. 
More capacity was added to the new outbound baggage system in June 2008, with final outbound capacity being reached prior to the holiday travel season of December 2008. 
The completion of the existing baggage handling system modifications is scheduled for September 2009. 
At completion, Vanderlande will have installed and commissioned approximately 900 conveyor drives for Delta Air Lines. 

Facts & figures         

Contract
  • Project milestones
    > Contract awarded: August 2007
    > Operational date:
    South Terminal Claim Units – Oct. 2007-April 2008
    B-South Outbound System – June 2008
    B-North Outbound Sort System - December 2008
    Concourse C Outbound System - April 2009
    South Terminal Mainline Refurbishment – phased from March to August 2009
 
  • Project organisation
    > Vanderlande as main contractor
 
 
 
System
  • Capacity (bph)
    > 6,000
  • Sorting
    > 115 VIPER pushers
  • Make-up
    > 16 flat CRESPLANAR carousels
  • Transfer
    > Two Transfer drop belts in Concourse B-North system
  • Reclaim
    > 9 tilted arrival TRIPLANAR carousels and one Oversize Claim belt
  • Identification
    > Automatic barcode reading (3 systems, SICK)
  • Controls
    > Brock Solutions SAC in B-North and HMI
  • Out of Gauge
    > Inbound OS line