This is the biggest single project secured to date delivered by Vanderlande in mainland China. The project was completed in just 29 months, working throughout the global pandemic and without impacting on the day-to-day operations in the other terminals. Vanderlande built and integrated the entire BHS which has total length of about 20 kilometres, including: the TUBTRAX individual carrier system (ICS) in the satellite terminal and Terminal 3; high-speed TUBTRAX (7m/s) ICS in the tunnel area, incorporating a mixed flow of standard and large carriers (for oversize bags); ten transfer check-in desks; conveyors; and carousels for flight make-up. It also supplied its VIBES software for low-level and high-level controls.