Project Details
Concourse-E EDS Recapitalization & Optimization
The duration of this project at Hartsfield-Jackson International Airport will be approximately two years. Installation is anticipated to begin in the Fall of 2024.
Project scope includes installation of 300 new conveyors, integration of (7) EDS machines and SS lines, and demolition of (12) EDS machines and related existing conveyor lines. The project will require labor including safety manager, baggage portering, testing labor, warehouse staff, logistic management, as well as a local warehouse.
Trade Opportunities
- Mechanical Subcontractors – Millwrights, Baggage Handling System or Conveyor experience preferred
- Controls Hardware and Panels build
- General Contracting (Construction)
- Engineering Services including Designer of Record
- Electrical Equipment wiring supplies
- Electrical Subcontractors, Baggage Handling System or Conveyor experience preferred
- General Freight Trucking, Long Distance
- General Freight Trucking, Local
- Temporary Help Services
- General Warehousing and Storage
- Site Preparation Contractors (Demolition Contractor)
- Remediation Services
- Staffing (site superintendents, porters, warehouse staff, safety, gate security services, etc)
- Rentals (Equipment, Site Trailers, etc.)
- Steel (fabrication / supply of header steel, catwalk, etc)
- Hardware
- Safety Management Services
- Vehicle Escort Services
Event details
Subcontractor / Supplier Outreach Event
Thursday, December 7, 2023
9:30 – 11 AM
Location:
Vanderlande Industries
3054 Chastain Meadows Pkwy NW
Marietta GA 30066
Please direct all inquiries to: 31892@vanderlande.com and include your full name, address, and contact number